CASE STUDY
Parakiore Recreation and Sports Centre
Parakiore Recreation and Sports Centre stands as one of Aotearoa New Zealand’s most ambitious community and high-performance sporting developments – a 32,000m² hub designed to support everyday recreation through to elite national and international events. Designed by Warren and Mahoney in association with Peddle Thorp and MJMA, and delivered on behalf of Crown Infrastructure Delivery for Christchurch City Council, the project required building systems that could perform at the highest level – structurally, acoustically, and in fire protection. KOROK was proud to contribute to this nationally significant development, supplying 300m² of KOROK® 78mm Galv Panel for key internal fire and acoustic separations within the complex.

- Year: 2025
- Location: Christchurch
- Client: Crown Infrastructure Delivery
- Market Segment: External
- Product Used: 78mm KOROK Galv Panels
- Architect: Warren and Mahoney in association with Peddle Thorp and MJMA
- Project Type: Sports and Recreation
The Challenge: Performance Across Scale, Safety & Sound
A building of this scale brings significant fire-safety and acoustic requirements. With large wet and dry zones, interconnected public spaces, high-performance training areas, and major event facilities, the project team required internal wall systems that delivered:
- High fire resistance for critical separation zones
- Reliable acoustic performance to manage noise transfer between pools, courts, fitness areas, and specialist spaces
- Lightweight construction to integrate efficiently into the steel-driven structural design
- Durability and compliance within a major civic facility expected to host two million visitors annually
This combination of acoustic control, fire protection, and constructability made KOROK’s systems an ideal fit.
KOROK® Solution
KOROK supplied 300m² of KOROK® 78mm Galv Panels, providing a robust fire- and acoustic-rated solution for internal separations within the facility. Why the 78mm Galv Panel Was Chosen:
- High-Performance Fire Rating. Manufactured from zinc-coated steel shells conforming to AS/NZS1397:2001 with a Z275 coating, the panels offer reliable and tested fire protection essential for a public facility of this scale.
- Excellent Acoustic Control. The aerated concrete core delivers strong airborne sound reduction — critical in a building that includes hydroslides, aquatic halls, gym spaces, and nine active courts.
- Lightweight & Efficient to Install. At just 10.2kg per lineal metre, the 78mm panel is easily handled on a complex construction site, allowing rapid installation and smoother coordination with other trades.
- Durability for Heavy-Use Environments. Designed to stand up to the demands of high-traffic public recreation centres and high-performance training areas.
The KOROK system contributed to meeting the project’s stringent fire-safety requirements while supporting the acoustic conditions necessary to create a functional and enjoyable environment across vastly different activity zones.
KOROK’s contribution helped ensure safe, durable, and high-performing internal environments within one of New Zealand’s most significant sport and recreation developments. The Parakiore facility will host community users, school groups, local clubs, and elite athletes alike – supported by dependable fire and acoustic separation systems designed to perform over decades of intensive use. KOROK is proud to support a project that not only enhances Christchurch’s sporting infrastructure but also delivers long-term social, economic, and recreational benefit for the region.















































