CASE STUDY

Taranaki Base Hospital

Project Maunga is the major redevelopment of Taranaki Base Hospital, delivering future‑focused healthcare facilities for the Taranaki region. The project sets new benchmarks for healthcare design, targeting Zero Energy and Zero Carbon certification through the International Living Future Institute (ILFI), while maintaining the rigorous fire, acoustic, and infection‑control standards required in a hospital environment.

Taranaki Base Hospital

Architectural Vision & Performance

Designed by Warren and Mahoney Architects, This project challenges traditional perceptions of hospital environments. The single‑level building prioritises accessibility, patient dignity, and clinical efficiency, while feeling more like a community clinic than a hospital.

After accounting for carbon‑sequestering materials, the building achieves a net upfront embodied carbon of –126 kg CO₂e/m², making it one of the first healthcare facilities globally to achieve a net‑negative carbon outcome.

Why KOROK® Was Chosen

KOROK® systems delivered the required fire resistance and acoustic performance for lift shafts, risers, and ducts, supporting patient safety, comfort, and regulatory compliance in a healthcare environment, while also enhancing construction efficiency. The system contributed to reduced construction time, and minimised programme risk.

The KOROK® 78 mm Galv Panel offered several advantages aligned with the project’s requirements:

  • Fire and acoustic performance: Providing compliant fire separation and acoustic control essential for hospital service zones.
  • Lightweight, high‑performance construction: Precision roll‑formed from AS/NZS 1397:2001 compliant zinc‑coated steel with a lightweight aerated concrete core, delivering strength at a nominal weight of just 10.2 kg per lineal metre.
  • Efficient installation in confined spaces: Single‑side installation reduced the need for internal scaffolding within shafts, improving safety and construction efficiency.
  • Reduced programme risk: Faster installation and minimal on‑site modification supported delivery within a complex, live hospital environment.

Outcome

The integration of KOROK® fire and acoustic rated wall systems supported the delivery of a world‑leading healthcare facility – one that combines sustainability leadership, patient‑centred design, and robust technical performance. At Taranaki Base Hospital, KOROK® has contributed to a building that is not only safe and durable, but also aligned with the project’s wider vision of resilience, efficiency, and long‑term environmental responsibility.