CASE STUDY

Air New Zealand Hangar 4

Project Overview
Air New Zealand’s Hangar 4 is the Southern Hemisphere’s largest single-span timber aircraft hangar, designed to simultaneously accommodate a widebody Boeing 787-9 Dreamliner and two Airbus A320/A321 aircraft. The facility includes hangar space alongside workshops and engineering areas, all designed with sustainability, operational efficiency, and safety in mind.

KOROK’s Role
KOROK Building Systems supplied KOROK® External Wall Systems for Hangar 4, delivering a complete solution for fire-rated, acoustic-rated, and weatherproof external walls. These systems were essential for providing safe, durable, and efficient separation across hangar and workshop areas, while withstanding New Zealand’s unique environmental conditions.

Air New Zealand Hangar 4

Project Highlights

  • Panels integrated seamlessly with the massive timber trusses, minimizing additional structural load.
  • All-in-one design simplified construction and accelerated the project timeline.
  • Fire and acoustic performance created a safe and productive working environment for Air New Zealand engineers.

Outcome
KOROK® External Wall Systems and 78mm Colour Panels supported Hangar 4 in achieving world-class standards in fire safety, acoustic separation, and weather resilience. The lightweight, durable, and efficient solution complemented the innovative mass timber construction, helping create a safe, functional, and sustainable aviation maintenance facility.

Products Used

  • KOROK® External Wall Systems: All-in-one solution for external walls, offering fast installation, fire and acoustic protection, and weatherproof durability without the need for cranes or engineered slabs.
  • 78mm KOROK® Colour Panels: Lightweight yet high-performance panels with a COLORSTEEL® steel shell and aerated concrete core, providing superior fire and acoustic protection while complementing the External Wall System.

Key Benefits Delivered

  • Lightweight & Cost-Effective: Reduced installation time and material costs.
  • Rapid, Simple Installation: Small installation teams managed wall construction efficiently.
  • Fire & Acoustic Efficiency: Enhanced safety and operational comfort in hangar and workshop spaces.

Related Projects