Failure to use correct lifting methods and PPE may result in severe injury or property damage.
- Applicable Panel Type: Fire-Rated Ceiling Access Panels
- Panel Weight: Heavy (Team lift required)
- PPE Required: Gloves, safety boots, hard hat, safety glasses
STEP 1. PREPARATION & SAFETY CHECKS
- Ensure all relevant site safety protocols and WorkSafe NZ guidelines are followed.
- Review the access panel warning label and lifting instructions prior to beginning.
- Conduct a job safety analysis (JSA) or task risk assessment.
- Inspect the work area for overhead hazards and confirm safe clearance for panel lowering.
- Confirm required PPE is worn and in good condition.
- Gather appropriate tools:
- Socket set or spanners
- Mechanical lifting aid (optional but recommended)
- Clean drop cloth or secure storage pallet
STEP 2. SUPPORTING THE PANEL
- Before any bolts are loosened, ensure the panel is securely supported by:
- Two competent personnel (manual lift), or
- An approved mechanical lifting device.
- Support the panel from beneath to prevent any unplanned movement.
STEP 3. BOLT REMOVAL PROCEDURE
- Remove all perimeter bolts, retaining one bolt at each angle line to maintain panel stability.
- Do not remove any screws or TEK-type fasteners that:
- Secure the panel frame to the hatch, or
- Secure support angles to the ceiling C-track structure.
STEP 5. CONDITION INSPECTION (PRE-REINSTALLATION)
Perform a full visual and physical inspection of the following components:
- Hatch door surface for warping, dents, or cracks
- Frame integrity including weld points and connection tabs
- Intumescent seal – check for continuous seal and any cracking or displacement
- Promatect® fire board – check for chipping, delamination, or moisture ingress
Replace any damaged or non-compliant components before proceeding with reinstallation.
STEP 6: REINSTALLATION PROCEDURE
- Position the access panel under the aperture using team lift or lifting device.
- Align the panel with the original bolt holes and insert bolts at each angleline.
- Once Securing nut and bolt assemblies are secured, reinstall remaining bolts in a crisscross pattern to ensure even loading.
- Torque all fasteners to manufacturer-recommended specification if available.
- Visually verify that the panel is flush with the ceiling and that all mechanical fixings are secured.